Monday, June 17, 2019
HNC Electrical Engineering Project Essay Example | Topics and Well Written Essays - 10000 words
HNC Electrical Engineering Project - Essay ExampleAs the proposed structure extension is to be progressed beyond the feasibility stage, this project proposal has been requested by the Estates and Facilities Department within the Trust to examine the proposals for the upgrading of the existing standby electrical energy generation provision in order to sum the extension. This project intends to give a detailed design and testing of the electrical generator system for the expand building. 1.1. The electrical layout of the Royal Lancaster Infirmary The electrical load requirement of the existing Royal Lancaster Infirmary, is in the high voltage range. The maximum electrical load quest of the existing sites peaks to around 875 KVA. According to the guidelines of the management policy of the Health Technical Memorandum 2011 (1992), this electrical load requirement is being satisfied by twain 500 ampere, 11 KV high tension supply running in parallel. The future(prenominal) 11KV is take n to an incoming breaker through a RMG from the incoming breaker, the 11 KV supply is passed on to the group coil breaker. From the group coil breaker, it gets split into quaternion transformers for supply boost up. There are four high tension breakers connecting the group coil breakers to the four transformers. To satisfy the load demand, two transformers of 500 KVA and two transformers of 315 KVA are used. ... Among the existing buildings, near of the electrical consumption is due to the demand in the medical unit that comprises the blood storage unit, the coronary care unit, the wards. These sections of the hospital demand critical supply of electrical power. The medical unit encompasses the plant rooms in the roof and the basement. The other units like the womens unit, the wards, the pharmacy, the pathology unit, the kitchen cum restaurant also consume considerable power. The wiring layout does not split the essential and critical sections of the electrical requirement from t hat of the non essential sections. Hence at present the generator load is same as the entire site load. The generator that is operational at present is a single generator that has a capacity of 530 KV at around 750 amps. This notice up is already highly loaded and the possibility of additional load is less. Also the existing generator is class 2 type and is capable of use only 50% of the rated capacity. To manage this, there are additional control systems that shed the load of non critical systems. 1.2. The current problem in electrical backup man The electrical requirement of the existing building as discussed earlier is being satisfied by a single generator. In this context, the proposal for extending two more mannikins of the hospital building has led to additional electrical load. The proposed new building phases include that of the phase 3 building called as the centenary building and the phase 4 building which is a new extension in the Royal Lancaster Infirmary site. The centenary building encompasses many blocks. The various blocks include the accident and essential unit, radiology unit, paediatric unit and the HSDU unit. These major units are located in the
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.